Hello, I’ve just got email notifications sending by unchecking the ‘attachments’ box. If I do have it checked, the job doesn’t look like it finishes. The duration keeps going up until the next scheduled time (5 minute intervals). But then I’ll see a message about “x jobs failed in the last 24 hours” and if I view the job details I do see errors for when the attachments are turned on, but the message is just “Abnormal job termination detected”.
Any ideas as to what’s going on there? I am able to export the PDF manually in about 15 seconds, which is what I was hoping would be attached to the email.
Thank you